home / social housing

Social Housing & Local Authority Retrofit

PAS 2030 · PAS 2035 · MCS · TRUSTMARK · CONSTRUCTIONLINE GOLD

Eco Systems Group delivers fully compliant retrofit programmes for housing associations, local authorities and Tier 1 contractors. We are PAS 2030 certified, work to PAS 2035, and are MCS-certified and TrustMark registered, so every measure we install meets the requirements for Warm Homes and other government-funded schemes. Since 2012 we have installed over 15,000 insulation and renewable measures.

COMPLIANCE & ACCREDITATIONS

Fully Compliant for Funded Retrofit

Government-funded retrofit has strict requirements. Under the Warm Homes: Social Housing Fund, installers must be TrustMark registered, energy efficiency measures must be installed by PAS 2030 certified installers under PAS 2035, and heat pumps, solar and batteries must be installed by MCS-certified installers. We meet all of these.

  • TrustMark registered business
  • IAA (formerly CIGA), licence 1911003: PAS 2030 cavity wall, room-in-roof and internal wall insulation; MCS air source heat pumps
  • BBA, licence 1973418: PAS 2030 external wall, loft, flat roof, floor and pitched roof insulation, glazing and doors
  • NICEIC, licence NIC13599: MCS solar PV and battery storage
  • Simply Certification, SICI22841: PAS 2030 storage heaters, heating controls and lighting
  • Constructionline Gold
UK home
2012

Established

15,000

Measures Installed

1000 +

Happy Customers

WHAT WE DELIVER

Fabric First and Low-Carbon Retrofit

Delivered directly for housing associations and councils, or as a delivery partner to Tier 1 contractors, including through the Warm Homes: Social Housing Fund and Warm Homes: Local Grant.

Wall Insulation

Cavity wall insulation (EPS bead and blown fibre) with a 25-year guarantee, plus external and internal wall insulation across all wall archetypes.

Roof & Floor Insulation

Loft, room-in-roof, pitched roof, flat roof and suspended floor insulation, delivered to PAS 2030.

Solar PV, Batteries & Heat Pumps

MCS-certified installation of solar PV, battery storage and air source heat pumps, following a fabric-first approach.

Heating, Controls & Ventilation

Heating and hot water controls, modern electric storage heaters, energy-efficient lighting, and ventilation to protect indoor air quality.

Damp, Mould & Remediation

Damp and mould assessment and remediation, plus cavity wall insulation extraction where previous installs have failed.

How we work

From Survey to Handover

  1. Survey and assessment to PAS 2035, including borescope checks on cavity walls.
  2. Coordination and design, fabric first, with the right ventilation strategy for each archetype.
  3. Resident liaison before, during and after works, with uniformed, ID-carrying teams.
  4. Installation mainly by our own trained teams, with a vetted subcontractor network for scale.
  5. Quality and lodgement: pre- and post-install checks, photographic evidence and TrustMark lodgement.
  6. Handover and reporting: guarantees, certificates and completion packs, with programme reporting.

We work directly with housing associations and councils, or as a delivery partner within a Tier 1 contractor’s supply chain. We cover London, the South East and the East of England, with UK-wide mobilisation by project.

Housing & Public Sector

Contact

Discuss an upcoming retrofit programme or tender. Call 0203 411 4885 or email info@ecosystemsgroup.co.uk. Case studies and our capability pack are available on request.

FOR HOUSING PROVIDERS

Frequently Asked Questions

Yes. We are PAS 2030 certified across a wide range of measures and deliver to the PAS 2035 retrofit framework.

 

Yes. We meet the installer requirements, including TrustMark registration, PAS 2030 certification and MCS certification for low-carbon technologies.

Yes. We work as a delivery partner within Tier 1 supply chains, as well as directly with housing associations and local authorities.

Yes, we are Constructionline Gold.

London, the South East and the East of England, with UK-wide coverage by project mobilisation.

Yes. Case studies and our capability pack are available on request. Call 0203 411 4885.